By Dmitriy
Since 1 October 2023, the US Food and Drug Administration has been able to refuse to even review a medical device submission because its cybersecurity documentation is incomplete. The power comes from Section 524B of the Food, Drug and Cosmetic Act, added by the Consolidated Appropriations Act of 2023, and the item manufacturers usually prepare for first is the software bill of materials, or SBOM. That is understandable. The SBOM is named in the statute, it has a recognised format, and tools can generate one in minutes.
It is also the easy part. Industry reviews of FDA’s follow-up letters suggest that submissions rarely fail because the SBOM is missing. They fail because nothing connects it to anything else: the component list does not feed a vulnerability assessment, the threat model does not lead to test evidence, and the plan for after launch reads like a promise. What FDA reviewers are actually asking for is a chain of reasoning, and building that chain is an engineering job rather than a documentation one.
What Section 524B actually requires
The statute applies to a “cyber device”, which the law defines with three conditions: the device includes software validated, installed or authorised by the manufacturer; it can connect to the internet, directly or indirectly; and it has technological characteristics that could be vulnerable to cybersecurity threats. In practice that covers most connected devices and a great deal of software that counts as a device in its own right, a category the site traced in how software became a medical device.
For those devices, a premarket submission must include three things:
- A plan to monitor, identify and address postmarket vulnerabilities, including coordinated vulnerability disclosure.
- Design, development and maintenance processes that provide reasonable assurance the device and related systems are cybersecure, including a way to deliver updates and patches.
- A software bill of materials covering commercial, open-source and off-the-shelf components.
The detail of what FDA expects for each sits in its premarket cybersecurity guidance, first finalised in September 2023 and revised since. Guidance is formally non-binding, but as regulatory commentators note, reviewers treat it as the practical bar for acceptance. Manufacturers who read the statute’s three bullet points as a checklist tend to discover the gap between them and the guidance in a deficiency letter.

Where submissions actually fail
FDA does not publish statistics on why cybersecurity sections are rejected, so the best available evidence comes from consultancies that review the letters their clients receive. Their findings are consistent enough to take seriously, with the caveat that the categories are theirs, not FDA’s. One analysis of more than 30 Additional Information letters by Blue Goat Cyber found cybersecurity risk assessment cited in about 60% of them. Across these reviews, three problems recur.
The SBOM is a list, not an analysis
The most common SBOM problem is not absence but incompleteness, and the guidance asks for more than component names and versions. According to a King & Spalding summary of the final guidance, each component should carry its level of support and an end-of-support date, and manufacturers should identify known vulnerabilities in those components, with CISA’s Known Exploited Vulnerabilities catalogue suggested as one source. FDA prefers machine-readable formats such as SPDX or CycloneDX. An SBOM exported once, at the end of development, from a build that has since changed, answers none of the questions a reviewer will ask next: which of these components have known vulnerabilities, which are reachable in your device, and what you did about the ones that are.
The threat model does not lead anywhere
A threat model that identifies risks but cannot show which design controls address each one, and which tests prove those controls work, is the pattern consultancies describe most often. Reviewers want to follow a thread: this interface exists, this is how it could be attacked, this is the control, this is the test result, this is the residual risk. When the threat model, risk records and test reports were produced by different people at different times, often with different names for the same components, the thread breaks and the reviewer asks for it in writing.
The postmarket plan is aspirational
A postmarket plan that says the manufacturer “will monitor for vulnerabilities and respond appropriately” does not meet the expectation. Reviewers look for a defined monitoring cadence, named sources, a coordinated disclosure process with a public intake, timelines for assessment and remediation, and a mechanism for actually delivering a patch to devices in the field. Several reviews also flag insufficient penetration testing as a growing source of questions, particularly where testing was scoped narrowly or done before the final architecture was settled.
The common thread is visible in all three. Each document might be acceptable on its own. The submission fails because the documents do not reference each other.

Traceability is an engineering property
It is tempting to treat this as a writing problem: hire a regulatory specialist, produce better documents, cross-reference them carefully. That works once. It breaks on the first software update, because the documents describe a device that no longer exists. Manufacturers that get through review cleanly, and stay compliant as the device evolves, tend to build the traceability into how the software is made.
- Generate the SBOM from the build, every build. If the SBOM is a by-product of the pipeline that produces the shipped software, it cannot drift from reality. Store it with the release, so that every version in the field has an exact component list.
- Attach the vulnerability assessment to the SBOM, not to a spreadsheet. Each component with a known vulnerability needs a recorded decision: not present in the shipped code, not reachable, mitigated by a named control, or fixed in a given release. Formats such as VEX (Vulnerability Exploitability eXchange) exist to record exactly this alongside the SBOM.
- Give every component, interface and control one identifier used across the architecture diagrams, threat model, risk register and test plan. Most broken traceability chains break on naming, not substance.
- Make the threat model a living artefact. Review it when the architecture changes, not when a submission is due, and require that every identified threat maps to at least one control and every control to at least one test.
- Test what the threat model says, and say what you tested. Penetration testing scoped from the threat model, run against the final build, produces evidence a reviewer can follow. Generic testing produces a report a reviewer has to interpret. This is where a dedicated quality assurance function pays for itself.
- Run the postmarket process before launch. Monitor your own SBOM against vulnerability feeds during development. By the time of submission, the plan describes a process that has already produced records, which is the most convincing evidence it will work.
None of these is specific to FDA. They are what secure software development looks like when it has to be demonstrated to an outsider, and the same chain of evidence serves audits under other regimes, a point the site made when mapping GDPR, HIPAA, SOC 2 and ISO 27001. The site’s own case study on developing and certifying a medical device covers what the wider certification path looks like in practice.
Why this outlasts the current guidance
FDA’s guidance has already been revised more than once since 2023, and it will change again. Specific expectations, such as particular SBOM fields or how vulnerability exploitability is recorded, will evolve. The underlying requirement will not, because it comes from the statute and from how reviewers reason: a manufacturer must show that it knows what is in its device, what could go wrong with it, what it has done about that, and how it will keep doing so after launch.
That is also why the SBOM-first approach disappoints. The list is the starting point of the argument, not the argument. A team that can trace any component in its device to an assessment, any threat to a control and a test, and any future vulnerability to a patch process will pass whichever version of the guidance is current. A team that cannot will keep receiving letters, however good its documents look.
For manufacturers planning a first connected device, or a software medical device, the practical conclusion is to decide on the traceability structure before writing code, not before writing the submission. It costs little at the start and is very expensive to reconstruct at the end.